I went to Dunsborough for the weekend. It was fabulous – very relaxing.
While there, I bought souvenir yarn (yes that is a thing) from Text and Co – this fantastic store that sells books and yarn (heaven).
I went to Dunsborough for the weekend. It was fabulous – very relaxing.
While there, I bought souvenir yarn (yes that is a thing) from Text and Co – this fantastic store that sells books and yarn (heaven).
Filed under Knitting, Sock Knitting, Yarn Stash
I have started a new sock using Fortissima Mexica in colour 908. I am using 2.75 mm zings.
I have started with a 2 by 2 twisted rib, which I really like, however I cast on 76 stitches (seems too many, but that was what my swatch suggested) and I want to use crosshatch lace, which is a multiple of 6. So I need to drop to 72 stitches. I can rip out what I have done and start again.
Rnd 1: *K3, K2tog, YO, K1; rep from *.
Rnd 2: *K2, K2tog, YO, K2; rep from *.
Rnd 3: *K1, K2tog, YO, K3; rep from *.
Rnd 4: *K2tog, YO, K4; rep from *.
Rnd 5: *K1, YO, ssk, K3; rep from *.
Rnd 6: *K2, YO, ssk, K2; rep from *.
Rnd 7: *K3, YO, ssk, K1; rep from *.
Rnd 8: *K4, YO, ssk; rep from *.
This is what I have from The Sock Knitter’s Handbook by Beth Parrott and Charlene Schurch.
Filed under Knitting, Sock Knitting
I finished my Christmas socks! They’re short socks for wearing in summer (it was 39 degrees yesterday!).
The yarn is from Daffodil Road – in the Poinsettia colour-way.
I used my usual needles (Knit Pro Zings – I really like these needles)
The sock is just a rib, heel flap and gusset and a foot. I used Kate Atherley’s toe construction.
Filed under Knitting, Sock Knitting, Yarn Stash
I have been working on a few of my projects. Miss P’s blanket is progressing (slowly), I switched to Knit Pro Zing needles and it has been much nicer.
I am on to the second sock of my Christmas socks, turned the heel, so now it’s just the gusset, the foot and the toe (I am maybe a third of the way through)
And finally my Halloween Cat cross stitch is very close to being finished – I just need to finish off the last cat and do the back stitching (there’s not much of that – whiskers and mouth).
Filed under Canvas Work, Cross Stitch, Cross Stitch, Knitting, Sock Knitting
I have finished one Christmas sock, which I started sometime in December (didn’t write down the date I started).
It’s a short sock, just a cuff and foot and I tried to make the cuff a bit more interesting using a twisted stitch.
Filed under Knitting, Sock Knitting
This year I concentrated (almost exclusively) on Miss A’s blanket. So, apart from that, I really didn’t finish much.
One pair of socks, a chicken (and a duck), and I worked on A’s quilt and my halloween cross stitch.
Next year I will be working on Miss P’s blanket, so once again not much will get done.
We went to Rottnest for a few days, and I took a little cross stitch away with me
14 count Aida done in the hand. And it reinvigorated my love of cross stitch, so I have been working on my Halloween Cat (by Satsuma Street).
Miss P turns 18 in early 2023, so I have started her blanket. It’s the same as Miss A’s but in purple shades.
The last is my Christmas sock, which is going to be short – for wearing in summer. It was 44 degrees yesterday (that’s 112.2 for you Fahrenheit people), so you can see why I need short socks. The yarn is Poinsettia from Daffodil Road Yarn. I bought it last year, but I imagine they do something similar every year.
I have tried to do an interesting rib – I used Gaughan’s Twisted Stitch Source Book and did a K2P2 rib, but the K2 has a right twist every second round. I think it is very effective.
Filed under Cross Stitch, Cross Stitch, Knitting, Sock Knitting
The yarn for Miss P’s blanket hasn’t arrived yet and I finished my socks, so I needed a new project. I remembered I bought the yarn last year for these little toys. The pattern is from Esther Joy Knits – called Fowl Friends.
The first one was definitely a learning opportunity and there are some things I will change next time.
I am knitting the duck now, each one takes about 6 hours from start to finish.
Filed under Knitting, Yarn Stash
After the marathon that was Miss A’s blanket, I finally finished something else – socks!
It’s a plain vanilla sock – cuff down. The yarn is from Louie and Lola – I am not sure how well it will hold up, but it is beautiful.
Filed under Knitting, Sock Knitting, Yarn Stash
A year in the making I finally finished my Log Cabin Moderne Blanket for Miss A.
It’s double bed size.
I finished it on the 31st Of October 2021 – started in November 2020
Miss P wants the same, but in purple. I have ordered the yarn, but the white is on back order at Bendigo. The other colours have been sent, but haven’t arrived yet. Once they arrive, I will think about re-jigging the colour scheme.
Filed under Knitting