I thought it was time I got on with the second sock!
The knitting is quite handy because I can do it anywhere – at the pool, waiting for the girls to finish their craft sessions (today they’re making a Superhero at our local library), standing in yet another queue somewhere.
I’m very keen to get this sock finished, so I can start on this yarn. I have a stitch pattern in mind – Eyelet Mock Cable Ribbing (it is from the latest Sockupied magazine). I’ve set myself a schedule – today I need to finish the leg. I don’t have a lot of time at the moment, it’s school holidays, or more correctly I seem to be wasting what time I have.