If I am to get my second sock finished by Monday (the 31st), then I need a plan of action.
Tuesday (25th): Work on sock leg.
Wednesday (26th): Finish sock leg.
Thursday (27th): Heel flap, turn heel, pick up heel stitches.
Friday (28th): Gusset
Saturday (29th): Foot
Sunday (30th): Toe
As you can see, I’ve left a spare day at the end because something is bound to come up or to take longer than I anticipate.